Following close collaboration with design architects Stiff + Trevillion during technical design, Veretec was appointed as Executive Architect by main contractor Multiplex to deliver 15 Bishopsgate, part of the Tower 42 Estate.

Project Details

  • Location London EC2
  • Area 6,600m² 71,000ft²
  • Status Complete
  • Sector Retail, Workplace
  • Client Tower 42 / Kirsch Family
  • Services Project Delivery
  • Design Architect Stiff + Trevillion
  • Contractor Multiplex

Awards

  • The Architects’ Company Building of the Year
    Shortlisted

This high-quality mixed-use development replaced and expanded an existing 1970s building adjacent to the Grade I listed Gibson Hall, providing a new six storey office.

The existing foundations were reused and the interconnection with Tower 42's basement was enhanced. Separate fully glazed one and two-storey retail pavilions and kiosks were also introduced along the northern pedestrian route connecting Bishopsgate to Old Broad Street.

15 Bishopsgate is a BREEAM Excellent Cat A office building and has an EPC A rating. The project completed in 2017.